6. Using a drill press, the poly board was centered for the second hole to be drilled out.6. Using a drill press, the poly board was centered for the second hole to be drilled out 7. The cutting blade cut the hole like butter. 8. The top coil over donuts were ready to hold our gasket in place. 9. The thick steel donut was marked and drilled out. 10. To keep the gasket in place, the donut was threaded with a 1/4x20 tap to allow the gasket to be mounted.10. To keep the gasket in place, the donut was threaded with a 1/4x20 tap to allow the ga 11. The gasket was bolted on using these 1/4x20 bolts, and they will keep it in the center.11. The gasket was bolted on using these 1/4x20 bolts, and they will keep it in the cente 12. The coil and cylinder were ready to be put in place. 13. The cylinder was ready and finally outfitted with a gasket that will not squeak while driving!13. The cylinder was ready and finally outfitted with a gasket that will not squeak while SOURCE GO-EZ Customs 4110 E. La Palma Anaheim CA 92804 714-474-6339 http://www.goezcustoms.com « | 1 | 2 | View Full Article By Saul Vargas Enjoyed this Post? Subscribe to our RSS Feed, or use your favorite social media to recommend us to friends and colleagues!