Lowrider Cars, Girls, Pictures and Car Shows at LowRiderMagazine.com
Newsletter

Quaker State Giveaway Dream Engine Build-up--Part Two

We continue putting together one fully done-up GM small-block.

0402Lrm Dream00 Z

We originally came up with the idea of building a fully done-up carbureted engine and then giving it away to some lucky lowrider enthusiast during a brainstorming session at a Lowrider staff meeting. After several months of planning and securing the involvement of many top aftermarket manufacturers, the Dream Engine project was on its way to becoming a reality. A key player was GM Performance, who donated the "hearts" of the Quaker State-sponsored giveaway--two new small-block 350-c.i.d. "crate" engines that are both rated at 330 horsepower right out of the box.

To begin part two of the build-up, we caught up with Jim at the Speed Shop in Glendale, California, who wrapped up the accessory assembly on the giveaway V-8. Jim bolted on all of the billet accessories, as well as the fuel delivery systems and miscellaneous parts that were needed to make the engine run.

As with any engine project, sometimes you run into an obstacle or two as the engine's coming together. We had to overcome a small setback as some of the parts that were donated turned out to be incorrect matches for what we needed and had to be replaced with the exact proper parts. On the plus side, the convenience of doing the tech with the Speed Shop was that we were able to use parts from their stock, although we only did this with small pieces. By the end of part two, the engine was looking good.

In the next segment of the Dream Engine build-up, we will be Dyno testing the new 350 to see how much horsepower the engine can produce with all of the bolt-on goodies that we have added. For now, follow along as we show you the progress of the build-up up to this point.

  • 0402Lrm Dream01 Z
    01. One advantage that we had in our build-up was that if we got stuck on parts we were able to improvise and take them out of the Speed Shop's stock.
    0402Lrm Dream01 Z
    01. One advantage that we had in our build-up was that if we got stuck on parts we were a
  • 0402Lrm Dream02 Z
    02. Here's a look at where we left off on the first part of the build-up. As you can tell, most of the engine was put together and needed only the detail work.
    0402Lrm Dream02 Z
    02. Here's a look at where we left off on the first part of the build-up. As you can tell
  • 0402Lrm Dream03 Z
    03. Jim used a six-groove belt to measure the belt size that would be needed for the engine routing. Remember to use the proper flow water pump when routing a serpentine system as you can blow up your engine if it's done incorrectly.
    0402Lrm Dream03 Z
    03. Jim used a six-groove belt to measure the belt size that would be needed for the engi
  • 0402Lrm Dream04 Z
    04. Jim started on the fuel system which included installing the Demon carburetor.
  • 0402Lrm Dream05 Z
    05. Next was to lube and install the fuel pump rod which works nonstop off of the cam.
    0402Lrm Dream05 Z
    05. Next was to lube and install the fuel pump rod which works nonstop off of the cam.
  • 0402Lrm Dream06 Z
    06. The street-designed fuel pump was perfect.
  • 0402Lrm Dream07 Z
    07. The fittings on the carb were the first to be tightened down.
  • 0402Lrm Dream08 Z
    08. Using high-pressure steel-braided hoses will help deliver the proper fuel needed, as well as help prevent vapor locking.
    0402Lrm Dream08 Z
    08. Using high-pressure steel-braided hoses will help deliver the proper fuel needed, as
  • 0402Lrm Dream09 Z
    09. Since we were already plumbing the carb, we decided to connect the vacuum for the distributor.
    0402Lrm Dream09 Z
    09. Since we were already plumbing the carb, we decided to connect the vacuum for the dis
  • 0402Lrm Dream10 Z
    10. Next on the fuel system was the very important fuel filter, which helps prevent trash and debris from screwing up the floats on your carburetor. This filter was going to be bolted down in an easily accessed area of the vehicle.
    0402Lrm Dream10 Z
    10. Next on the fuel system was the very important fuel filter, which helps prevent trash
  • 0402Lrm Dream11 Z
    11. High-pressure Teflon sealer was used for the fuel filters.
  • 0402Lrm Dream12 Z
    12. This Professional Products fuel filter was ready to be fitted with the fuel line.
    0402Lrm Dream12 Z
    12. This Professional Products fuel filter was ready to be fitted with the fuel line.
  • 0402Lrm Dream13 Z
    13. The mechanical fuel pump needed fittings so that it could be connected to the rest of the fuel delivery system.
    0402Lrm Dream13 Z
    13. The mechanical fuel pump needed fittings so that it could be connected to the rest of
  • 0402Lrm Dream14 Z
    14. The rest of the engine was ready to be plumbed with steel-braided components.
  • 0402Lrm Dream15 Z
    15. Jim made quick work of the small task of connecting the fuel lines.
  • 0402Lrm Dream16 Z
    16. The fuel delivery system was ready to be fed with high octane.
  • 0402Lrm Dream17 Z
    17. The next step was to install the stainless steel Lokar spring throttle holder.
  • 0402Lrm Dream18 Z
    18. The tension spring was hooked into place.
  • 0402Lrm Dream19 Z
    19. The Lokar setup was ready to be put into place.
  • 0402Lrm Dream20 Z
    20. With all of the billet accessories being bolted on, these GM chrome covers were going to be swapped out.
    0402Lrm Dream20 Z
    20. With all of the billet accessories being bolted on, these GM chrome covers were going
  • 0402Lrm Dream21 Z
    21. The heads were checked out to make sure that they didn't leak any oil when the valve gaskets went back on.
    0402Lrm Dream21 Z
    21. The heads were checked out to make sure that they didn't leak any oil when the valve
  • 0402Lrm Dream22 Z
    22. The ball-milled valve covers really complemented the billet accessories that were being used on the engine.
    0402Lrm Dream22 Z
    22. The ball-milled valve covers really complemented the billet accessories that were bei
  • 0402Lrm Dream23 Z
    23. Jim aligned the high-torque Power Master starter with the B&M heavy duty 350 flywheel.
    0402Lrm Dream23 Z
    23. Jim aligned the high-torque Power Master starter with the B&M heavy duty 350 flywheel
  • 0402Lrm Dream24 Z
    24. Next on the agenda was to wire up the Flame Thrower distributor and coil.
  • 0402Lrm Dream25 Z
    25. Jim started laying out the high-current MSD sparkplug wire needed to make the engine run.
    0402Lrm Dream25 Z
    25. Jim started laying out the high-current MSD sparkplug wire needed to make the engine
  • 0402Lrm Dream26 Z
    26. Jim started to crimp the sparkplug wires with the right electrical boots to make the distributor spark properly.
    0402Lrm Dream26 Z
    26. Jim started to crimp the sparkplug wires with the right electrical boots to make the
  • 0402Lrm Dream27 Z
    27. As you can see, the wiring task can be a little confusing as it involves several wires.
    0402Lrm Dream27 Z
    27. As you can see, the wiring task can be a little confusing as it involves several wire
  • 0402Lrm Dream28 Z
    28. The wiring of the sparkplug wires was ready to pass current through the ignition system.
    0402Lrm Dream28 Z
    28. The wiring of the sparkplug wires was ready to pass current through the ignition syst
  • 0402Lrm Dream29 Z
    29. The wiring of the sparkplug wires was ready to pass current through the ignition system.
    0402Lrm Dream29 Z
    29. The wiring of the sparkplug wires was ready to pass current through the ignition syst
Enjoyed this Post? Subscribe to our RSS Feed, or use your favorite social media to recommend us to friends and colleagues!
Lowrider Magazine